There are many types of split type hydraulic cylinders, which are widely applied in the lifting of construction, the repair of highways and bridges, mining, slope tunnels, the maintenance of mining machinery and other mechanical equipment. The weight it can lift can reach thousands of tons, while its own weight is only a few dozen kilograms. Even an adult can move it. Moreover, during the usage process, it can maintain a very stable lifting of heavy objects. Of course, this is because its hydraulic structure determines its current function.
One drive two configuration scheme
2 units split type hydraulic cylinders, 1 unit hydraulic hand pump, 1pc one drive two distribution valve, 3pcs hydraulic hoses and 6 pairs of quick couplings.

Parameters of RC154 hydraulic cylinder attached:
Capacity: 15T
Stroke: 101mm
Closed Height: 200mm
Working Pressure: 70Mpa
Select the corresponding hydraulic hand pump according to the amount of oil required when the cylinder is lifted.
Connection points:
When using a split type hydraulic cylinder, overloading is not allowed. Once the rated stroke is reached, the operation should be stopped immediately. If multiple split type hydraulic cylinders are working simultaneously, professional staff must be present to direct the operation. It be ensured that there will be no deviation in the lifting and lowering between each point only in this way.
When placing multiple split type hydraulic cylinders , there are certain considerations. For adjacent split type hydraulic cylinders , a gap must be left. If possible, it is best to use wooden blocks to separate them to ensure the distance between the two sides. At the same time, attention should be paid to the quick coupling part. Safety is the most important, so be sure to check whether it is reliable.
When operating multiple hydraulic cylinders with a distribution valve, the load should be evenly distributed across all the cylinders, and the tonnage and stroke of each cylinder should be consistent. If any asynchronous phenomenon is found during the lifting process, work should be stopped immediately to check the cause and determine if additional lifting points are needed to ensure the safety and reliability of the lifting process.