Graded jacking hydraulic jack is used for cyclic jacking of very large offshore oil platforms
Publication date: 2022-09-08
Graded jacking hydraulic jack is used for cyclic jacking of very large offshore oil platforms
Graded jacking hydraulic jack is used for cyclic jacking of very large offshore oil platforms

As offshore oil development continues to move towards the deep water area, the area and volume of offshore oil platforms are growing, and the traditional crane installation can no longer meet the demand, but the step-by-step jacking process can meet the requirements of tonnage and accuracy during installation. The PLC synchronous jacking system is used to control the synchronous jacking of multiple points, and the computer transmits data in real time, which is safe and accurate.


Gradual jacking
Gradual jacking
Graded jacking hydraulic jack is used for cyclic jacking of very large offshore oil platforms
Graded jacking hydraulic jack is used for cyclic jacking of very large offshore oil platforms
Graded jacking hydraulic jack is used for cyclic jacking of very large offshore oil platforms
Graded jacking hydraulic jack is used for cyclic jacking of very large offshore oil platforms
Graded jacking hydraulic jack is used for cyclic jacking of very large offshore oil platforms
Graded jacking hydraulic jack is used for cyclic jacking of very large offshore oil platforms

Parameters of this test:

Graded jacking hydraulic jack:

Load capacity: 150T

Stroke: 200mm

Body height: 458mm

Pallet diameter: 800mm

Saddle diameter: 200mm