Replacement of Steel Bearings on the Beijing–Shanghai Railway Bridge
Publication date: 2025-03-28
  • Apps: Bridges
  • Used: synchronous lifting system

The steel bearing replacement project on the Beijing–Shanghai Railway bridge utilized eight 320-ton hydraulic cylinders integrated with a PLC-controlled 8-point synchronous lifting system, achieving highly precise lifting operations.