The high-speed railway slab track fine adjustment project utilizes a synchronized lifting system with hydraulic jacks to precisely adjust the height and alignment of slab tracks. By fine-tuning the position and flatness of each slab, all bolt holes can be accurately aligned, ensuring the installation precision of fasteners. This process significantly reduces the need for further track adjustment after fastening and guarantees the smooth operation of railway vehicles.
Project Configuration List:




PLC Multi-Point Hydraulic Synchronized Lifting System:
Displacement Synchronization Accuracy: ≤0.5 mm
Operating Voltage: AC380V/50Hz
Maximum System Pressure: 35 MPa
Operation Mode: Push-button and touchscreen operation
Control Method: Pulse-width modulation control
Synchronization Points: 4-point synchronization per unit
Double-Acting Hydraulic Jack:
Rated Capacity: 10 tons
Stroke: 250 mm
Closed Height: 396 mm
Operating Pressure: 31.5 MPa
For decades, our company has specialized in providing engineering solutions for heavy loads, high-precision control, multi-logic operations, and multi-point control systems. We deliver safe and efficient equipment and services for applications such as multi-point synchronized jacking, lateral sliding, vertical lifting, tensioning, synchronized movement of large components, asymmetrical weighing, spatial attitude adjustment, intelligent mobility, and handling of large-scale equipment.