The necessity of building correction and reinforcement and jacking correction methods
Publication date: 2022-09-17
Schematic diagram of building correction and reinforcement
Schematic diagram of building correction and reinforcement

The necessity of correction and reinforcement:

1. When the building first tilts, it has little impact on the building, but with the further occurrence of uneven settlement, when the tilt reaches a certain value, it will affect the appearance of the building at best, and in severe cases, it will also cause the main weighing components to crack, and eventually cause the building to collapse partially or as a whole.

2. When the inclination value of the building reaches the standard of dangerous houses, it must be corrected, structural reinforcement and other work must be carried out, or it can only be demolished and rebuilt. Once the project is demolished and rebuilt, its cost must be higher than that of ordinary new buildings.

Therefore, choosing a reasonable method to correct and reinforce the inclined building is a more preferential feasible solution than demolition and reconstruction.

Jacking correction method:

Specifically, we use hydraulic jack jacking method to correct deviation and reinforcement, jack jacking method is to cut the bottom wall of the house after the foundation of the house is strengthened, so that the superstructure and the basement part are separated, a certain number of jacks are set in the structural separation part, and the jack jacking is used, by adjusting the jacking amount of each part of the house, the part with large foundation settlement is lifted, so as to achieve the purpose of correction. "Building Correction and Righting Hydraulic Jack Jacking Correction Method"

For more correction methods, please refer to:"Building Correction and Righting Hydraulic Jack Jacking Correction Method"

Keyword